Lift-Database » Lifts in the world
3-CLF Hintersee



| General information | |
|---|---|
| Place | Hintersee |
| resort | ?? |
| Region | Salzburg |
| Country | |
| Name of lift | Hintersee |
| Type | 3-CLF |
| Lift manufacturer | Doppelmayr |
| Year of construction | 1978 |
| Commissioning date | 1978 |
| Date of closing down | 21 mrt 2022 |
| Infos for handicapped persons |
|---|
| Sorry, no information available. |
| Characteristics |
|---|
| The Hintersee lift was the first three-seat-chairlift in Austria. It was the first lift of Doppelmayr what has special pads on the chairs what makes the get-in more comfortable. The Chairlift was built with 25 Mil. ATS cost. |
| geometric data | |
|---|---|
| Height of valley station | 750 m |
| Height of middle station(s) | 840 m |
| Height of mountain station | 1230 m |
| Vertical rise | 480 m |
| Route distance | 1743 m |
| Horizontal length | 1660,25 m |
| Average incline | 29,40 % |
| Largest incline | 63,70 % |
| Number of pillars | 23 Stk |
| Greatest spanwidth | 160 m |
| Max ground clearance | 13 m |
| Trackwidth drive | ?? m |
| Trackwidth line | ?? m |
| Trackwidth return | ?? m |
| Angle of wrap (drive wheel) | ?? ° |
| Drive altitude of site | 4 m |
| Maximum capacity | 1358 Pers/h |
| Travel time | 14,4 min |
| Driving speed line | 2,0 m/s |
| electrical data | |
|---|---|
| Electrical control | Siemens |
| Remote control and telemonitoring system | Siemens |
| Power control system | Frey Austria |
| Number of drive | 1 Stk |
| Drive power (Start) | ?? kW |
| Drive power (Operation) | ?? kW |
| Brake power | ?? kW |
| Continuous brake power | ?? kW |
| Driving station | Mountain station |
| Drive type | electrical |
| Traction of drive | electromechanical |
| Emergency drive | diesel engine |
| Traction of emergency drive | hydrostatic |
| cabins data | |
|---|---|
| Grip type | ?? |
| Cab manufacturer | Doppelmayr |
| Cab model | ?? |
| Seating | polystyrene |
| Seat heater | no |
| Persons per cab | 3 |
| Number of cabs | 205 Stk |
| Cab distance | ?? m |
| Cab interval | ?? s |
| rope data | |
|---|---|
| Rope manufacturer | St. Egydyer |
| Length of haul rope | ?? m |
| Total weight of haul rope | ?? t |
| Haul rope diameter | ?? mm |
| Nominal strength of haul rope | ?? N/mm² |
| Breaking strength of rope | ?? kN |
| Tensionstation haulrope | Valley station |
| Tension type | rope tension weight |
| Tension way | 7 m |
| miscellaneous data | |
|---|---|
| Transport uphill | 100 % |
| Transport downhill | 100 % |
| Drive direction | left |
| Construction costs | ?? ATS |
| Currency (Construction costs) | Austrian schilling |
| Construction period | 6 months |
| Seasontime | ❄ winter |
| Loading carpet | no |
| Evacuation ropeway | no |
| Integrated rescue system | no |
| Autonomous ropeway | no |
| Asset number (Trail map) | B |
Updates
Datas: 18 sep 2024
PHOTOS: ??
Lift-Statistics
15918 visit(s) since 11 mei 2004
Last visit 24 nov 2025
LIFT-WORLD IDs
Lift-ID: 3155
Place-ID: 249
https://www.seilbahntechnik.net/en/lifts/3155/datas.htm
Datas: 18 sep 2024
PHOTOS: ??
Lift-Statistics
15918 visit(s) since 11 mei 2004
Last visit 24 nov 2025
LIFT-WORLD IDs
Lift-ID: 3155
Place-ID: 249
https://www.seilbahntechnik.net/en/lifts/3155/datas.htm

Deutsch
English
Français
Italiano
Česky
Nederlands

