Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  3-CLF Hintersee










General information  
Place Hintersee 
resort ?? 
Region Salzburg 
Country   
Name of lift Hintersee 
Type 3-CLF 
Lift manufacturer Doppelmayr 
Year of construction 1978 
Commissioning date 1978 
Date of closing down 21/03/22 


Infos for handicapped persons
Sorry, no information available.

Characteristics
The Hintersee lift was the first three-seat-chairlift in Austria.
It was the first lift of Doppelmayr what has special pads on the chairs what makes the get-in more comfortable.
The Chairlift was built with 25 Mil. ATS cost.

geometric data  
Height of valley station 750 m
Height of middle station(s) 840 m
Height of mountain station 1230 m
Vertical rise 480 m
Route distance 1743 m
Horizontal length 1660,25 m
Average incline 29,40 %
Largest incline 63,70 %
Number of pillars 23 Stk
Greatest spanwidth 160 m
Max ground clearance 13 m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site 4 m
Maximum capacity 1358 Pers/h
Travel time 14,4 min
Driving speed line 2,0 m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system Siemens 
Power control system Frey Austria 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating polystyrene 
Seat heater no 
Persons per cab
Number of cabs 205 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer St. Egydyer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way 3 m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 6 months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 22/11/23
PHOTOS: ??

Lift-Statistics
12251 visit(s) since 11/05/04
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 3155
Place-ID: 249

https://www.seilbahntechnik.net/en/lifts/3155/datas.htm