Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Chiavello



General information  
Place Valtorta 
resort ?? 
Region Lombardia 
Country   
Name of lift Chiavello 
Type 4-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2010 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1333,9 m
Height of mountain station 1726,50 m
Vertical rise 392,55 m
Route distance 1352,72 m
Horizontal length 1277,00 m
Average incline 30,78 %
Largest incline ?? %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 5,20 m
Trackwidth line 5,20 m
Trackwidth return 5,20 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800(2400) Pers/h
Travel time 4,50 min
Driving speed line 5,0(4,0) m/s
Driving speed station 1,00 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 2 Stk
Drive power (Start) 652 kW
Drive power (Operation) 564 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model 4E95 
Seating leather 
Seat heater no 
Persons per cab 4 
Number of cabs 73 Stk
Cab distance 40 m
Cab interval 6 s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 42 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way 3,00 m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 6 months
Seasontime ❄ winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system no 
Rope position control yes 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 29 okt 2026
PHOTOS: ??

Lift-Statistics
10111 visit(s) since 1 nov 2010
Last visit 3 nov 2026

LIFT-WORLD IDs
Lift-ID: 14998
Place-ID: 4538

https://www.seilbahntechnik.net/en/lifts/14998/datas.htm