Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  22-FUC Falkenburgbahn

Line
Line

Cabin at middle station
Cabin at middle station

Cabin at middle station
Cabin at middle station

General information  
Place Bad Herrenalb 
resort ?? 
Region Baden-Wuerttemberg 
Country   
Name of lift Falkenburgbahn 
Type 22-FUC 
Lift manufacturer von Roll 
Year of construction 1998 
Commissioning date ?? 
Date of closing down Sep 4, 2012 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 352,0 m
Height of middle station(s) 387,5 m
Height of mountain station 398,9 m
Vertical rise 46,0 m
Route distance 117,0 m
Horizontal length ?? m
Average incline ?? %
Largest incline 63,7 %
Trackwidth drive ?? m
Trackwidth line 1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 260 Pers/h
Travel time 2,0 min
Driving speed line 1,6 m/s

electrical data  
Electrical control Frey 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 22 
Number of cabs 1 Stk
Carriage Operator ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope 145 m
Length of counter-rope ?? m
Total weight of haul rope ?? t
Total weight of counter-rope ?? t
Haul rope diameter 20 mm
Counter-rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? DEM
Currency (Construction costs) Deutsche Mark 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Type of turnout ?? 
Integrated rescue system ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: Jul 13, 2025
PHOTOS: ??

Lift-Statistics
13553 visit(s) since May 2, 2006
Last visit Aug 26, 2026

LIFT-WORLD IDs
Lift-ID: 9347
Place-ID: 271

https://www.seilbahntechnik.net/en/lifts/9347/datas.htm