Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Expo2000 I

Station
Station

Line
Line

General information  
Place Hanover 
resort Expo 2000 
Region Lower Saxony 
Country   
Name of lift Expo2000 I 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 2000 
Commissioning date ?? 
Date of closing down ?? 
Date of pull down ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Rebuilt in Schönau (Belchen Seilbahn)

geometric data  
Height of valley station ?? m
Height of mountain station ?? m
Vertical rise ?? m
Route distance 1741 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time ?? min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model LaPerla 
Seating ?? 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s
Garage type none 
Garage place nowhere 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? DEM
Currency (Construction costs) Deutsche Mark 
Construction period ?? months
Seasontime summer 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 21/07/23
PHOTOS: ??

Lift-Statistics
6219 visit(s) since 30/09/05
Last visit 16/03/25

LIFT-WORLD IDs
Lift-ID: 8123
Place-ID: 281

https://www.seilbahntechnik.net/en/lifts/8123/datas.htm