Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Kopfbergbahn

Valley station
Valley station

Mountain station
Mountain station

Valley Station
Valley Station

General information  
Place Annaberg im Lammertal 
resort ?? 
Region Salzburg 
Country   
Name of lift Kopfbergbahn 
Type 4-CLF 
Lift manufacturer Doppelmayr 
Year of construction 2000 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 777,00 m
Height of middle station(s) ?? m
Height of mountain station 1063,30 m
Vertical rise 286,30 m
Route distance 1050,28 m
Horizontal length ?? m
Average incline 28,33 %
Largest incline 55,13 %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,8 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1594 Pers/h
Travel time 6,75 min
Driving speed line 2,6 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 232 kW
Drive power (Operation) 184 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 90 Stk
Cab distance 23,49 m
Cab interval 9,04 s


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 38 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 6 months
Seasontime winter 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Asset number (Trail map) A1 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 01/11/23
PHOTOS: ??

Lift-Statistics
15033 visit(s) since 09/09/03
Last visit 19/04/24

LIFT-WORLD IDs
Lift-ID: 540
Place-ID: 348

https://www.seilbahntechnik.net/en/lifts/540/datas.htm