Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Pezidbahn

Valley station
Valley station

Valley station
Valley station

Line
Line

General information  
Place Serfaus 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Pezidbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2004 
Commissioning date 2004 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2328 m
Height of mountain station 2748,50 m
Vertical rise 420,50 m
Route distance 1377,76 m
Horizontal length ?? m
Average incline 33,48 %
Largest incline 69,27 %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 4,65 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 560 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Swoboda 
Cab model ULTRA 8 Update 
Seating Icolan 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 46 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 25 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 3 months
Seasontime ??  
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 26/12/23
PHOTOS: ??

Lift-Statistics
21500 visit(s) since 26/11/04
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 5246
Place-ID: 137

https://www.seilbahntechnik.net/en/lifts/5246/datas.htm