Lift-Database » Lifts in the world
8-MGD Gondelbahn Hohe Salve
Line
Entering the Mountain Station
General information | |
---|---|
Place | Soell |
resort | ?? |
Region | Tyrol |
Country | |
Name of lift | Gondelbahn Hohe Salve |
Type | 8-MGD |
Lift manufacturer | Doppelmayr |
Year of construction | 2000 |
Commissioning date | 2000 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1155 m |
Height of mountain station | 1825 m |
Vertical rise | 670 m |
Route distance | 1836 m |
Horizontal length | ?? m |
Average incline | 39,50 % |
Largest incline | 74,00 % |
Number of pillars | 12 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | 5,5 m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1600 Pers/h |
Travel time | 6,12 min |
Driving speed line | 5,0 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | Doppelmayr |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | DT 108 |
Cab manufacturer | Carvatech |
Cab model | ULTRA 8 S |
Seating | ?? |
Seat heater | no |
Heater | no |
Aircon | no |
Persons per cab | 8 |
Number of cabs | 47 Stk |
Cab distance | 90 m |
Cab interval | 18 s |
Garage type | underground |
Garage place | valley station |
Garage direction | backward |
Loading direction | forward |
rope data | |
---|---|
Rope manufacturer | Teufelberger |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | left |
Construction costs | ?? ATS |
Currency (Construction costs) | Austrian schilling |
Construction period | 9 months |
Seasontime | ❄ ☀ all-season |
Evacuation ropeway | no |
Integrated rescue system | no |
Rope position control | ?? |
Asset number (Trail map) | 42 |
Updates
Datas: 11/06/23
PHOTOS: ??
Lift-Statistics
25764 visit(s) since 01/12/02
Last visit 07/10/24
LIFT-WORLD IDs
Lift-ID: 450
Place-ID: 80
https://www.seilbahntechnik.net/en/lifts/450/datas.htm
Datas: 11/06/23
PHOTOS: ??
Lift-Statistics
25764 visit(s) since 01/12/02
Last visit 07/10/24
LIFT-WORLD IDs
Lift-ID: 450
Place-ID: 80
https://www.seilbahntechnik.net/en/lifts/450/datas.htm