  8-MGD Gondelbahn Hohe Salve

Line
Line

Entering the Mountain Station
Entering the Mountain Station

General information  
Place Soell 
resort ?? 
Region Tyrol 
Country   
Name of lift Gondelbahn Hohe Salve 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2000 
Commissioning date 2000 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1155 m
Height of mountain station 1825 m
Vertical rise 670 m
Route distance 1836 m
Horizontal length ?? m
Average incline 39,50 %
Largest incline 74,00 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,5 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1600 Pers/h
Travel time 6,12 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Carvatech 
Cab model ULTRA 8 S 
Seating ?? 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 47 Stk
Cab distance 90 m
Cab interval 18 s
Garage type underground 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 9 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) 42 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/06/23