Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD La Ramasse

valley station (Lanslebourg)
valley station (Lanslebourg)

valley station
valley station

Lift line
Lift line

General information  
Place Val Cenis 
resort ?? 
Region Rhône-Alpes 
Country   
Name of lift La Ramasse 
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2003 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1400 m
Height of mountain station 2040 m
Vertical rise 640 m
Route distance 2222 m
Horizontal length 1903 m
Average incline 29 %
Largest incline 60 %
Number of pillars 22 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 5,5 m
Trackwidth line 6,1 m
Trackwidth return 6,1 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2700 Pers/h
Travel time 7,45 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control SEIREL 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 890 kW
Drive power (Operation) 750 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type A108 
Cab manufacturer Doppelmayr 
Cab model 6E98 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 91 Stk
Cab distance ?? m
Cab interval ?? s
Garage type emergency rail 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/04/22
PHOTOS: ??

Lift-Statistics
7031 visit(s) since 02/05/04
Last visit 25/04/24

LIFT-WORLD IDs
Lift-ID: 4070
Place-ID: 1230

https://www.seilbahntechnik.net/en/lifts/4070/datas.htm