Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


2-CLD Mühlberg





Infos for handicapped persons
Sorry, no information available.

Characteristics
re-builded in Imst (Alpjochbahn)

General information  
Place Scharnitz
resort
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Mühlberg 
Type 2-CLD 
Lift manufacturer Felix Wopfner 
Year of construction 1989 
Commissioning date ??
Date of closing down 1996
Date of pull down 1996

geometric data  
Height of valley station ?? m
Height of mountain station ?? m
Vertical rise ?? m
Route distance 1070 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1200 Pers/h
Travel time ?? min
Driving speed line ?? m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control STG 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Felix Wopfner
Cab model ??
Seating ??
Seat heater no
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s
Garage type none
Garage place nowhere
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Situation of entrance ??
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 05/02/18 22:41:54
PHOTOS: ????

Lift-Statistics
3493 visit(s) since 19/03/05
Last visit 27/05/20

LIFT-WORLD IDs
Lift-ID: 404
Place-ID: 166

https://www.seilbahntechnik.net/en/lifts/404/datas.htm