Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Kronplatz 1


Valley station
Valley station

Valley station
Valley station

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Bruneck / Brunico
resort
Dolomiti Superski
Region Trentino-Alto Adige
Country IT Italy, Italia
Name of lift Kronplatz 1 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 2003 
Commissioning date ??

geometric data  
Height of valley station 945 m
Height of mountain station 1851 m
Vertical rise 906 m
Route distance 2871 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 26 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2250 Pers/h
Travel time 8,0 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 54 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 1240 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer CWA
Cab model OMEGA III-8
Seating carpet
Seat heater no
Heater ??
Aircon ??
Persons per cab
Number of cabs 84 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 8 months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 09/11/15 21:33:19
PHOTOS: 22/02/06 19:58:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
12504 visit(s) since 21/04/04
Last visit 21/11/19

LIFT-WORLD IDs
Lift-ID: 3697
Place-ID: 1329

https://www.seilbahntechnik.net/en/lifts/3697/datas.htm