Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  1-CLF Alpenrose (II)

former valley station
former valley station

General information  
Place Westendorf 
resort SkiWelt 
Region Tyrol 
Country   
Name of lift Alpenrose (II) 
Type 1-CLF 
Lift manufacturer Swoboda 
Year of construction 1969 
Commissioning date ?? 
Date of closing down 2008 
Date of pull down 2008 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1327 m
Height of middle station(s) ?? m
Height of mountain station 1826 m
Vertical rise 499 m
Route distance 1194 m
Horizontal length ?? m
Average incline 45,80 %
Largest incline 86,00 %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 900 Pers/h
Travel time 8,8 min
Driving speed line 2,3 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 146 Stk
Cab distance 9,2 m
Cab interval 4 s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Asset number (Trail map) 112 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 21/09/23
PHOTOS: ??

Lift-Statistics
21161 visit(s) since 30/11/03
Last visit 08/10/24

LIFT-WORLD IDs
Lift-ID: 369
Place-ID: 72

https://www.seilbahntechnik.net/en/lifts/369/datas.htm