Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-MGD Roche de Mio

Maintenance area
Maintenance area

Line
Line

Line
Line

General information  
Place La Plagne 
resort Paradiski 
Region Rhône-Alpes 
Country   
Name of lift Roche de Mio 
Type 6-MGD 
Lift manufacturer Poma 
Year of construction 1975 
Commissioning date ?? 

Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2086 m
Height of middle station(s) ?? m
Height of mountain station 2732 m
Vertical rise 646 m
Route distance 2760 m
Horizontal length ?? m
Average incline ?? %
Largest incline 50 %
Number of pillars 27 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1440 Pers/h
Travel time ?? min
Driving speed line 4,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Sigma 
Cab model ?? 
Seating ?? 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 163 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley and mountain 
Garage direction ?? 
Loading direction ?? 

rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

Chronologie

Support
Wrong data or something is missing?
Support us!