Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-MGD Schöckelseilbahn

Line (2015)
Line (2015)

General information  
Place St. Radegund bei Graz 
resort ?? 
Region Styria 
Country   
Name of lift Schöckelseilbahn 
Type 6-MGD 
Lift manufacturer Girak 
Year of construction 1995 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 780 m
Height of mountain station 1436 m
Vertical rise 656 m
Route distance 2087 m
Horizontal length 1933,3 m
Average incline 33,90 %
Largest incline 70,50 %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,8 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1000 Pers/h
Travel time 6,9 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Frey Austria 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 534 kW
Drive power (Operation) 359 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type Nockenklemme Typ A 
Cab manufacturer Swoboda 
Cab model ULTRA 6 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 44 Stk
Cab distance 108 m
Cab interval 21,5 s
Garage type ground floor 
Garage place valley and mountain 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer VA Austria Draht 
Length of haul rope 4200 m
Total weight of haul rope 26,16 t
Haul rope diameter 41 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way 5 m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 8 months
Seasontime summer 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16/02/24
PHOTOS: ??

Lift-Statistics
6286 visit(s) since 19/09/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 3201
Place-ID: 552

https://www.seilbahntechnik.net/en/lifts/3201/datas.htm