Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Stuhleckbahn

line
line

mountain station
mountain station

Bullwheel
Bullwheel

General information  
Place Spital am Semmering 
resort Stuhleck 
Region Styria 
Country   
Name of lift Stuhleckbahn 
Type 4-CLD/B 
Lift manufacturer Girak 
Year of construction 1992 
Commissioning date 19/12/92 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Middle station (entry and exit)
Entry at uphill ride
Entry and exit at descent
Austria's longest four-seater chairlift

geometric data  
Height of valley station 782 m
Height of middle station(s) 818 m
Height of mountain station 1320 m
Vertical rise 538 m
Route distance 2733 m
Horizontal length ?? m
Average incline 20,40 %
Largest incline 53,10 %
Number of pillars 25 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2160 Pers/h
Travel time 10,1 min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type Nockenklemme Typ A 
Cab manufacturer Girak 
Cab model ?? 
Bubble colour neutral 
Seating polystyrene 
Seat heater no 
Persons per cab
Number of cabs 202 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 19/01/24
PHOTOS: ??

Lift-Statistics
13844 visit(s) since 06/10/03
Last visit 26/04/24

LIFT-WORLD IDs
Lift-ID: 3187
Place-ID: 543

https://www.seilbahntechnik.net/en/lifts/3187/datas.htm