Lift-Database » Lifts in the world
1-CLF Sesselbahn Wilder Kaiser I

Bottom Station Lift 1

Middle Station Lift 1

Top Station Lift 1
General information | |
---|---|
Place | Kufstein |
resort | ?? |
Region | Tyrol |
Country | ![]() |
Name of lift | Sesselbahn Wilder Kaiser I |
Type | 1-CLF |
Lift manufacturer | Swoboda |
Year of construction | 1970/15 |
Commissioning date | 01 / 1971 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 500 m |
Height of middle station(s) | ?? m |
Height of mountain station | 894 m |
Vertical rise | 393 m |
Route distance | 1317 m |
Horizontal length | 1241 m |
Average incline | ?? % |
Largest incline | ?? % |
Number of pillars | 20 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 306 Pers/h |
Travel time | 9,7 min |
Driving speed line | 2,25 m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | 83 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Doppelmayr |
Cab model | ?? |
Seating | polystyrene |
Seat heater | no |
Persons per cab | 1 |
Number of cabs | 100 Stk |
Cab distance | 16,3 m |
Cab interval | 9,6 s |
rope data | |
---|---|
Rope manufacturer | Teufelberger |
Length of haul rope | 2840 m |
Total weight of haul rope | 6,1628 t |
Haul rope diameter | 24 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Mountain station |
Tension type | rope tension weight |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | left |
Construction costs | ?? ATS |
Currency (Construction costs) | Austrian schilling |
Construction period | 4 months |
Seasontime | ☀ summer |
Loading carpet | no |
Evacuation ropeway | yes |
Integrated rescue system | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: May 25, 2024
PHOTOS: ??
Lift-Statistics
25289 visit(s) since Mar 19, 2005
Last visit Apr 30, 2025
LIFT-WORLD IDs
Lift-ID: 311
Place-ID: 466
https://www.seilbahntechnik.net/en/lifts/311/datas.htm
Datas: May 25, 2024
PHOTOS: ??
Lift-Statistics
25289 visit(s) since Mar 19, 2005
Last visit Apr 30, 2025
LIFT-WORLD IDs
Lift-ID: 311
Place-ID: 466
https://www.seilbahntechnik.net/en/lifts/311/datas.htm