Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-MGD Alpenrosenbahn I










General information  
Place Westendorf 
resort SkiWelt 
Region Tyrol 
Country   
Name of lift Alpenrosenbahn I 
Type 6-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1987 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 796 m
Height of mountain station 1318 m
Vertical rise 522 m
Route distance 1485 m
Horizontal length ?? m
Average incline 38,00 %
Largest incline 89,90 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2120 Pers/h
Travel time 5,0 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control AEG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type diesel engine 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DS 106 
Cab manufacturer CWA 
Cab model OMEGA 6s 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 160 Stk
Cab distance 51 m
Cab interval ?? s
Garage type ground floor 
Garage place valley and middle station(s) 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 41 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) 110 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16/08/24
PHOTOS: ??

Lift-Statistics
28076 visit(s) since 19/09/03
Last visit 06/10/24

LIFT-WORLD IDs
Lift-ID: 3024
Place-ID: 72

https://www.seilbahntechnik.net/en/lifts/3024/datas.htm