Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Ganzeralmbahn










General information  
Place Neukirchen am Grossvenediger 
resort ?? 
Region Salzburg 
Country   
Name of lift Ganzeralmbahn 
Type 4-CLD 
Lift manufacturer Leitner 
Year of construction 1995 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1843 m
Height of mountain station 2098 m
Vertical rise 255 m
Route distance 947 m
Horizontal length 906 m
Average incline ?? %
Largest incline 54,10 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,3 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2200 Pers/h
Travel time 4,5 min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 290 kW
Drive power (Operation) 260 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 70 Stk
Cab distance 29,45 m
Cab interval 6,55 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 38 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 15/01/23
PHOTOS: ??

Lift-Statistics
13342 visit(s) since 09/10/03
Last visit 20/04/24

LIFT-WORLD IDs
Lift-ID: 2763
Place-ID: 188

https://www.seilbahntechnik.net/en/lifts/2763/datas.htm