  2-MGD Monte Gomito



General information  
Place Abetone 
resort ?? 
Region Toscana 
Country   
Name of lift Monte Gomito 
Type 2-MGD 
Lift manufacturer Piemonte Funivie 
Year of construction 1973 
Commissioning date ?? 
Date of closing down 25 Apr 1999 
Date of pull down 1999 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1330 m
Height of mountain station 1892 m
Vertical rise 562 m
Route distance 2156 m
Horizontal length 2066 m
Average incline ?? %
Largest incline ?? %
Number of pillars 26 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 800 Pers/h
Travel time 10 min
Driving speed line 3,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating ?? 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 143 Stk
Cab distance 31,5 m
Cab interval 9 s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 34,5 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ??? %
Drive direction ?? 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 10 months
Seasontime ??  
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25 Apr 2026
PHOTOS: ??

Lift-Statistics
6 visit(s) since 26 Apr 2026
Last visit 28 Apr 2026

LIFT-WORLD IDs
Lift-ID: 26587
Place-ID: 1275

https://www.seilbahntechnik.net/en/lifts/26587/datas.htm