Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Hurricane



General information  
Place Henniker 
resort Pats Peak 
Region New Hampshire 
Country   
Name of lift Hurricane 
Type 4-CLF 
Lift manufacturer Garaventa-CTEC 
Year of construction 2025 
Commissioning date 5 Jan 2026 
Second-hand lift. Formerly lift no. 21530 


Infos for handicapped persons
Sorry, no information available.

Characteristics
second-Hand Lift from Southington (Lake Compounce), new drive terminal from Skytrac

geometric data  
Height of valley station ?? m
Height of mountain station ?? m
Vertical rise ?? m
Route distance ?? m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity ?? Pers/h
Travel time ?? min
Driving speed line ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CTEC 
Cab model ?? 
Seating duckboard (plastic) 
Seat heater no 
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? USD
Currency (Construction costs) United States dollar 
Construction period ?? months
Seasontime winter 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 2 Feb 2026
PHOTOS: ??

Lift-Statistics
160 visit(s) since 2 Feb 2026
Last visit 11 Feb 2026

LIFT-WORLD IDs
Lift-ID: 26272
Place-ID: 3126

https://www.seilbahntechnik.net/en/lifts/26272/datas.htm