Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD Le Solert


valley station
valley station

valley station
valley station

Lift line and valley station
Lift line and valley station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Val Cenis
resort
Region Rhône-Alpes
Country FR France
Name of lift Le Solert 
Type 6-CLD 
Lift manufacturer Poma 
Year of construction 2000 
Commissioning date ??

geometric data  
Height of valley station 2070 m
Height of mountain station 2553 m
Vertical rise 1321 m
Route distance 483 m
Horizontal length ?? m
Average incline 40 %
Largest incline 45 %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,7 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 4,9 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 42,5 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 612 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Poma
Cab model ??
Seating leather
Seat heater no
Persons per cab
Number of cabs 61 Stk
Cab distance 40 m
Cab interval 8,0 s
Garage type emergency rail
Garage place mountain station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Situation of entrance parallel
Situation of exit parallel
Loading carpet ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 04/12/05 09:36:00
PHOTOS: 14/03/05 17:38:59

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
5186 visit(s) since 03/09/03
Last visit 15/10/19

LIFT-WORLD IDs
Lift-ID: 2595
Place-ID: 1230

https://www.seilbahntechnik.net/en/lifts/2595/datas.htm