Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Großes Kar

Valley station
Valley station

Mountain station
Mountain station

Pillar
Pillar

General information  
Place Gostling an der Ybbs 
resort Sunny Card 
Region Lower Austria 
Country   
Name of lift Großes Kar 
Type 2-CLF 
Lift manufacturer Girak 
Year of construction 1980 
Commissioning date 1980 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1383 m
Height of mountain station 1799 m
Vertical rise 416 m
Route distance 1386 m
Horizontal length ?? m
Average incline 31,80 %
Largest incline 68,70 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1400 Pers/h
Travel time 9,1 min
Driving speed line 2,5 m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive ?? 
Emergency drive diesel engine 
Traction of emergency drive mechanical 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model 2E Fix 
Seating polystyrene 
Seat heater no 
Persons per cab
Number of cabs 224 (160) Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) VI 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 27/10/23
PHOTOS: ??

Lift-Statistics
8665 visit(s) since 30/08/03
Last visit 06/05/24

LIFT-WORLD IDs
Lift-ID: 2536
Place-ID: 414

https://www.seilbahntechnik.net/en/lifts/2536/datas.htm