Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  12-MGD Larnags










General information  
Place Laax 
resort LAAX 
Region Grisons 
Country   
Name of lift Larnags 
Type 12-MGD 
Lift manufacturer Garaventa 
Year of construction 1989 
Commissioning date 16/12/89 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1082 m
Height of mountain station 1162 m
Vertical rise 79,51 m
Route distance 585 m
Horizontal length 577,35 m
Average incline 13,77 %
Largest incline ?? %
Number of pillars 4 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 4,80 m
Trackwidth line 5,50 m
Trackwidth return 5,50 m
Angle of wrap (drive wheel) 180 °
Drive altitude of site 1166 m
Maximum capacity 2400 Pers/h
Travel time 1,65 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 209 kW
Drive power (Operation) 159 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type DS 215 
Cab manufacturer CWA 
Cab model OMEGA 12 
Seating none 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 12 
Number of cabs 21 Stk
Cab distance 108 m
Cab interval 18 s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope 1309,11 m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope 1730 kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 14/09/23
PHOTOS: ??

Lift-Statistics
13991 visit(s) since 04/09/04
Last visit 20/05/24

LIFT-WORLD IDs
Lift-ID: 2477
Place-ID: 2086

https://www.seilbahntechnik.net/en/lifts/2477/datas.htm