Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Hannigbahn



General information  
Place Saas-Fee 
resort ?? 
Region Valais 
Country   
Name of lift Hannigbahn 
Type 10-MGD 
Lift manufacturer Garaventa 
Year of construction 2023/24 
Commissioning date 20/04/24 


Infos for handicapped persons
Sorry, no information available.

Characteristics
partly integrated into the buildings of the old railway

geometric data  
Height of valley station 1822 m
Height of mountain station 2337 m
Vertical rise 515 m
Route distance 1104 m
Horizontal length 972 m
Average incline 53 %
Largest incline 88 %
Number of pillars 7 Stk
Greatest spanwidth 333 m
Max ground clearance 33,4 m
Trackwidth drive 6,4 m
Trackwidth line 6,4 m
Trackwidth return 6,4 m
Angle of wrap (drive wheel) 180 °
Drive altitude of site 2343 m
Maximum capacity 800 Pers/h
Travel time 4,85 min
Driving speed line 5,0 m/s
Driving speed station 0,19 m/s

electrical data  
Electrical control Frey 
Remote control and telemonitoring system Frey 
Power control system Frey 
Number of drive 1 Stk
Drive power (Start) 352 kW
Drive power (Operation) 267 kW
Brake power 200 kW
Continuous brake power 200 kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type D5000 
Cab manufacturer CWA 
Cab model Omega V - 10 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 13 Stk
Cab distance 224 m
Cab interval 45 s
Garage type ground floor 
Garage place mountain station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope 2266 m
Total weight of haul rope 19,85 t
Haul rope diameter 48 mm
Nominal strength of haul rope 1860 N/mm²
Breaking strength of rope 1806 kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way 5,0 m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 05/05/24
PHOTOS: ??

Lift-Statistics
96 visit(s) since 18/09/23
Last visit 09/05/24

LIFT-WORLD IDs
Lift-ID: 24350
Place-ID: 1725

https://www.seilbahntechnik.net/en/lifts/24350/datas.htm