Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF DSB Aineck

Photo taken in february 2007
Photo taken in february 2007

February 2008
February 2008

Line
Line

General information  
Place St. Margarethen im Lungau 
resort ?? 
Region Salzburg 
Country   
Name of lift DSB Aineck 
Type 2-CLF 
Lift manufacturer Doppelmayr 
Year of construction 1993 
Commissioning date 1993 
Date of closing down 08/04/18 
Date of pull down 09/04/18 


Infos for handicapped persons
Sorry, no information available.

Characteristics
sold to El Colorado (Chile)

geometric data  
Height of valley station 1066 m
Height of middle station(s) ?? m
Height of mountain station 1553 m
Vertical rise 487 m
Route distance 1703 m
Horizontal length ?? m
Average incline 29,90 %
Largest incline 48,00 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1440 Pers/h
Travel time 15,8 min
Driving speed line 2,8 m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 345 kW
Drive power (Operation) 260 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 245 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 36 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 23/06/23
PHOTOS: ??

Lift-Statistics
14785 visit(s) since 14/08/03
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 2401
Place-ID: 27

https://www.seilbahntechnik.net/en/lifts/2401/datas.htm