Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6/8-CGD Dorfj@t Natrun

Line
Line

Valley station
Valley station

Valley station
Valley station

General information  
Place Maria Alm 
resort ?? 
Region Salzburg 
Country   
Name of lift Dorfj@t Natrun 
Type 6/8-CGD 
Lift manufacturer Doppelmayr 
Year of construction 2002 
Commissioning date ?? 
Date of closing down 19/08/18 
Date of pull down 2018 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 810 m
Height of mountain station 1108 m
Vertical rise 298 m
Route distance 1100 m
Horizontal length ?? m
Average incline ?? %
Largest incline 72 %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1300 Pers/h
Travel time 3,98 min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 320 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model ?? 
Bubble colour ?? 
Seating ?? 
Seat heater no 
Persons per cab 6/8 
Number of cabs 32 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 2300 m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 5 months
Seasontime ❄ ☀ all-season 
Situation of entrance ?? 
Situation of exit ?? 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) 22 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 05/12/23
PHOTOS: ??

Lift-Statistics
25401 visit(s) since 28/03/03
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 2280
Place-ID: 234

https://www.seilbahntechnik.net/en/lifts/2280/datas.htm