Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  100-FUC Sommerbergbahn

old Cabin
old Cabin

General information  
Place Bad Wildbad 
resort ?? 
Region Baden-Wuerttemberg 
Country   
Name of lift Sommerbergbahn 
Type 100-FUC 
Lift manufacturer ME 
Year of construction 1907/28/ 
Commissioning date 23 mei 1908 
Date of closing down 11 / 2010 
Date of pull down 2011 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 428 m
Height of middle station(s) 495 m
Height of mountain station 726 m
Vertical rise 298 m
Route distance 756 m
Horizontal length ?? m
Average incline 44 %
Largest incline 52 %
Trackwidth drive ?? m
Trackwidth line 1,00 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1100 Pers/h
Travel time 6 min
Driving speed line 2,6 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 100 
Number of cabs 2 Stk
Carriage Operator ?? 


rope data  
Rope manufacturer Pfeifer Drako 
Length of haul rope 815 m
Length of counter-rope ?? m
Total weight of haul rope 4,66 t
Total weight of counter-rope ?? t
Haul rope diameter 41 mm
Counter-rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation haulrope Mountain station 
Tension type none 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? DEM
Currency (Construction costs) Deutsche Mark 
Construction period 13 months
Seasontime ❄ ☀ all-season 
Type of turnout ?? 
Integrated rescue system ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 9 dec 2025
PHOTOS: ??

Lift-Statistics
8955 visit(s) since 19 mrt 2005
Last visit 11 feb 2026

LIFT-WORLD IDs
Lift-ID: 2144
Place-ID: 276

https://www.seilbahntechnik.net/en/lifts/2144/datas.htm