Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-MGD Salvista Gondelbahn












Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Itter
resort SkiWelt
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Salvista Gondelbahn 
Type 4-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1989 
Commissioning date 1989

geometric data  
Height of valley station 668 m
Height of mountain station 1349 m
Vertical rise 681 m
Route distance 2233 m
Horizontal length ?? m
Average incline 32,90 %
Largest incline 73,70 %
Number of pillars 23 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1252 Pers/h
Travel time 7,3 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type DS 104
Cab manufacturer Swoboda
Cab model Austro Panorama 4
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 90 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) 30 




This information are for members only visible!



Updates
Datas: 06/11/18 17:22:28
PHOTOS: 12/02/04 15:17:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
17844 visit(s) since 19/09/03
Last visit 18/09/19

LIFT-WORLD IDs
Lift-ID: 1925
Place-ID: 77

https://www.seilbahntechnik.net/en/lifts/1925/datas.htm