Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF/B Hausbergbahn

Valley station
Valley station

Line
Line

Line
Line

General information  
Place Ellmau 
resort ?? 
Region Tyrol 
Country   
Name of lift Hausbergbahn 
Type 2-CLF/B 
Lift manufacturer Doppelmayr 
Year of construction 1988 
Commissioning date 1988 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 824 m
Height of mountain station 1092 m
Vertical rise 268 m
Route distance 1065 m
Horizontal length ?? m
Average incline 26,30 %
Largest incline 65,80 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 919 Pers/h
Travel time 8,0 min
Driving speed line 2,2 m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system Elin 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type 2FG 
Cab manufacturer Doppelmayr 
Cab model ?? 
Bubble colour neutral 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 125 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) 90 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 30/06/23
PHOTOS: ??

Lift-Statistics
26285 visit(s) since 11/09/03
Last visit 05/10/24

LIFT-WORLD IDs
Lift-ID: 1922
Place-ID: 74

https://www.seilbahntechnik.net/en/lifts/1922/datas.htm