Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


10-MGD Cortina - Colfiere - Col Drusciè





Infos for handicapped persons
Sorry, no information available.

Characteristics
Middle-Station

General information  
Place Cortina d'Ampezzo
resort
Dolomiti Superski
Region Veneto
Country IT Italy, Italia
Name of lift Cortina - Colfiere - Col Drusciè 
Type 10-MGD 
Lift manufacturer Leitner 
Year of construction 2019 
Commissioning date 22/12/19

geometric data  
Height of valley station ?? m
Height of mountain station ?? m
Vertical rise 557 m
Route distance 2168 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 (2000) Pers/h
Travel time ?? min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 882 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type LPA
Cab manufacturer Sigma
Cab model DIAMOND - C10D210
Seating carpet
Seat heater no
Heater no
Aircon ??
Persons per cab 10 
Number of cabs 47 (53) Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground
Garage place Middle station(s)
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ??  EUR 
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/06/20 16:54:46
PHOTOS: ????

Lift-Statistics
909 visit(s) since 18/02/20
Last visit 07/08/20

LIFT-WORLD IDs
Lift-ID: 19159
Place-ID: 1382

https://www.seilbahntechnik.net/en/lifts/19159/datas.htm