Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Hala Skrzyczeńska - Zbójnicka Kopa

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Szczyrk 
resort ?? 
Region Silesia 
Country   
Name of lift Hala Skrzyczeńska - Zbójnicka Kopa 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2018 
Commissioning date 2018 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 998 m
Height of mountain station 1204 m
Vertical rise 206206 m
Route distance 1691 m
Horizontal length 1664 m
Average incline ?? %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time ?? min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 482 kW
Drive power (Operation) 373 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Bubble colour neutral 
Seating leather 
Seat heater ?? 
Persons per cab
Number of cabs 67 Stk
Cab distance 54 m
Cab interval 10,8 s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 40 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance ?? 
Situation of exit ?? 
Loading carpet ?? 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 17/09/22
PHOTOS: ??

Lift-Statistics
3092 visit(s) since 15/02/19
Last visit 19/03/24

LIFT-WORLD IDs
Lift-ID: 18848
Place-ID: 921

https://www.seilbahntechnik.net/en/lifts/18848/datas.htm