Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-MGD Saulire 2

Line
Line

Line
Line

old middle station
old middle station

General information  
Place Meribel 
resort Les Trois Vallées 
Region Rhône-Alpes 
Country   
Name of lift Saulire 2 
Type 6-MGD 
Lift manufacturer Poma 
Year of construction 1982 
Commissioning date 1982 
Date of closing down 2011 
Date of pull down 2011 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2113 m
Height of mountain station 2687 m
Vertical rise 574 m
Route distance 1800 m
Horizontal length ?? m
Average incline 32 %
Largest incline 75 %
Number of pillars 22 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1700 Pers/h
Travel time 7,5 min
Driving speed line 4,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 480 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer Sigma 
Cab model ?? 
Seating none 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 78 Stk
Cab distance 50,8 m
Cab interval 12,7 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 40 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway yes 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 08/05/23
PHOTOS: ??

Lift-Statistics
8921 visit(s) since 19/03/05
Last visit 27/03/24

LIFT-WORLD IDs
Lift-ID: 1880
Place-ID: 1130

https://www.seilbahntechnik.net/en/lifts/1880/datas.htm