Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-MGD Alpe Palú-Cima Motta



General information  
Place Chiesa in Valmalenco 
resort ?? 
Region Lombardia 
Country   
Name of lift Alpe Palú-Cima Motta 
Type 2-MGD 
Lift manufacturer Piemonte Funivie 
Year of construction 1964 
Commissioning date ?? 
Date of closing down 1992 
Date of pull down 1994 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Between 1992-1994 used only by mountain service.

geometric data  
Height of valley station ?? m
Height of middle station(s) ?? m
Height of mountain station 2336 m
Vertical rise 313 m
Route distance 1524 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 500 Pers/h
Travel time ?? min
Driving speed line ?? m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 110 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating ?? 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 64 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ??? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
Evacuation ropeway ?? 
Integrated rescue system no 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 5 avr. 2026
PHOTOS: ??

Lift-Statistics
6981 visit(s) since 5 mars 2015
Last visit 16 juin 2026

LIFT-WORLD IDs
Lift-ID: 17848
Place-ID: 1361

https://www.seilbahntechnik.net/en/lifts/17848/datas.htm