Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD Tschein


Valley Station
Valley Station

Mountain Station
Mountain Station

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Welschnofen
resort
Dolomiti Superski
Region , Trentino-Alto Adige
Country IT Italy, Italia
Name of lift Tschein 
Type 6-CLD 
Lift manufacturer Leitner 
Year of construction 2014 
Commissioning date ??

geometric data  
Height of valley station 1603 m
Height of mountain station 1981 m
Vertical rise 378 m
Route distance 1885 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1600 (2000) Pers/h
Travel time 6 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 44 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ??
Power control system ??
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 441 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive direct drive
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type LPA
Cab manufacturer Leitner
Cab model ??
Seating leather
Seat heater no
Persons per cab
Number of cabs 74 Stk
Cab distance ?? m
Cab interval ?? s
Garage type emergency rail
Garage place mountain station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs 7  EUR 
Currency (Construction costs) Euro 
Construction period 5 months
Seasontime winter
Situation of entrance 90°
Situation of exit parallel
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) 404 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 28/03/20 07:32:33
PHOTOS: 17/10/16 23:04:15

Lift-Statistics
7730 visit(s) since 16/11/14
Last visit 05/06/20

LIFT-WORLD IDs
Lift-ID: 17695
Place-ID: 1662

https://www.seilbahntechnik.net/en/lifts/17695/datas.htm