Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Stiergarten





Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Sexten / Sesto
resort
Dolomiti Superski
Region Trentino-Alto Adige
Country IT Italy, Italia
Name of lift Stiergarten 
Type 8-MGD 
Lift manufacturer Leitner 
Year of construction 2014 
Commissioning date ??

geometric data  
Height of valley station 1668,0 m
Height of middle station(s) 1727 m
Height of mountain station 2092 m
Vertical rise 424 m
Route distance 1790,54 m
Horizontal length 1716 m
Average incline ?? %
Largest incline ?? %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1500 (1800) Pers/h
Travel time ?? min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) 330 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type LPA
Cab manufacturer ??
Cab model ??
Seating leather
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 41 (50) Stk
Cab distance 115,20 (96) m
Cab interval 19,20 (16) s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system no
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 11/03/19 21:50:11
PHOTOS: ????

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
5880 visit(s) since 02/11/14
Last visit 15/10/19

LIFT-WORLD IDs
Lift-ID: 17689
Place-ID: 1600

https://www.seilbahntechnik.net/en/lifts/17689/datas.htm