Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Bocksberg

Downhill station July 2014
Downhill station July 2014

Downhill station and track
Downhill station and track

Downhill station July 2014
Downhill station July 2014

General information  
Place Hahnenklee 
resort Bocksberg 
Region Lower Saxony 
Country   
Name of lift Bocksberg 
Type 4-CLF 
Lift manufacturer BMF 
Year of construction 2014 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Hook for transport of mountainbike is available

geometric data  
Height of valley station 524 m
Height of mountain station 727 m
Vertical rise 171 m
Route distance 943 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1900 Pers/h
Travel time 6 min
Driving speed line 2,6 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 170 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 95 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer Redaelli 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 40 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 8 months
Seasontime ❄ ☀ all-season 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: Mar 24, 2025
PHOTOS: ??

Lift-Statistics
13112 visit(s) since May 17, 2014
Last visit Oct 17, 2025

LIFT-WORLD IDs
Lift-ID: 17261
Place-ID: 187

https://www.seilbahntechnik.net/en/lifts/17261/datas.htm