Lifts in the world

100-AT Gletscherbahn

Line
Line

Technical details
Technical details





  Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Garmisch-Partenkirchen
resort Zugspitze
Region Bavaria, Bayern
Country DE Germany, Deutschland
Name of lift Gletscherbahn 
Type 100-AT 
Lift manufacturer Hölzl 
Year of construction 1992 
Commissioning date ??

geometric data  
Height of valley station 2595 m
Height of middle station(s) ?? m
Height of mountain station 2943 m
Vertical rise 348 m
Route distance 995 m
Horizontal length ?? m
Average incline 53 %
Largest incline 56,3 %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 7,0 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1000 Pers/h
Travel time 3,5 min
Driving speed line 9,0 m/s
Speed on towers ?? m/s

rope data  
Rope manufacturer ??
Length of carrying rope ?? m
Length of traction rope ?? m
Length of counter-rope ?? m
Total weight of carrying rope ?? t
Total weight of traction rope ?? t
Total weight of counter-rope ?? t
Carrying rope diameter ?? mm
Traction rope diameter ?? mm
Counter-rope diameter ?? mm
Nominal strength of carrying rope ?? N/mm²
Nominal strength of traction rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of carrying rope ?? kN
Breaking strength of traction rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation carryingrope ??
Tensionstation tractionrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 472 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer CWA
Cab model ??
Heater ??
Aircon ??
Persons per cab 100 
Number of cabs 2 Stk
Carriage Operator ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Construction period 18 months
Seasontime ??
Type of turnout ??
Moving platform ??
Evacuation ropeway ??
Integrated rescue system ??
Asset number (Trail map) ?? 




  This information are for members only visible!



Updates
Lift-Statistics
Datas: 27/05/10 22:07:00
11764 visit(s) since 26/12/02
PHOTOS: 18/11/06 13:14:00
Last visit 21/02/19
 
Support
Wrong data or something is missing?
Support us!
LIFT-WORLD IDs
Lift-ID: 1661
Place-ID: 157


http://www.seilbahntechnik.net/en/lifts/1661/datas.htm







Lift fulltext search

Advanced search
Login
Login-Name
Password

Advertising