Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-CLD/B Zweitausender

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Jochberg 
resort ?? 
Region Tyrol 
Country   
Name of lift Zweitausender 
Type 8-CLD/B 
Lift manufacturer Leitner 
Year of construction 2012 
Commissioning date 2012 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1519 m
Height of mountain station 1993 m
Vertical rise 474 m
Route distance 1426 m
Horizontal length 1326 m
Average incline ?? %
Largest incline ?? %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 7,30 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 4,45 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 650 kW
Drive power (Operation) 564 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Bubble colour ?? 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 60 Stk
Cab distance 51,43 m
Cab interval 10,29 s
Garage type ground floor 
Garage place mountain station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 4 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) G7 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 23/11/23
PHOTOS: ??

Lift-Statistics
18619 visit(s) since 28/10/12
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 16017
Place-ID: 57

https://www.seilbahntechnik.net/en/lifts/16017/datas.htm