Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Seetalbahn










General information  
Place Spittal an der Drau 
resort ?? 
Region Carinthia 
Country   
Name of lift Seetalbahn 
Type 2-CLF 
Lift manufacturer De Pretis 
Year of construction 1981 
Commissioning date 08/01/82 
Date of closing down 2011 
Date of pull down 2016 


Infos for handicapped persons
Sorry, no information available.

Characteristics
2 Bachmanncorner

geometric data  
Height of valley station 1889,0 m
Height of mountain station 2114,30 m
Vertical rise 225,30 m
Route distance 957,53 m
Horizontal length 917,45 m
Average incline 24,60 %
Largest incline 56,70 %
Number of pillars 12 Stk
Greatest spanwidth 141 m
Max ground clearance 17,3 m
Trackwidth drive 3,6 m
Trackwidth line 3,6 m
Trackwidth return 3,6 m
Angle of wrap (drive wheel) 180 °
Drive altitude of site 2115 m
Maximum capacity 800 Pers/h
Travel time 10,0 min
Driving speed line 1,6 m/s

electrical data  
Electrical control AEG 
Remote control and telemonitoring system AEG 
Power control system AEG 
Number of drive 1 Stk
Drive power (Start) 105 kW
Drive power (Operation) 90,4 kW
Brake power 56,3 kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer Girak 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 117 Stk
Cab distance 14,40 m
Cab interval 9,00 s


rope data  
Rope manufacturer Austria Draht 
Length of haul rope 2020 m
Total weight of haul rope 7,5 t
Haul rope diameter 32 mm
Nominal strength of haul rope 1960 N/mm²
Breaking strength of rope 779 kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way 5,0 m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 7 months
Seasontime ❄ ☀ all-season 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/02/22
PHOTOS: ??

Lift-Statistics
10722 visit(s) since 30/04/03
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 1470
Place-ID: 544

https://www.seilbahntechnik.net/en/lifts/1470/datas.htm