Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD/B Schilt


Line
Line

Line
Line

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place
resort
Region Berne
Country CH Switzerland, Confoederatio Helvetica
Name of lift Schilt 
Type 4-CLD/B 
Lift manufacturer Garaventa 
Year of construction 2002 
Commissioning date ??

geometric data  
Height of valley station 1949 m
Height of middle station(s) ?? m
Height of mountain station 2259 m
Vertical rise 310 m
Route distance 1623 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 5,4 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 40 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type ??
Tension way ?? m

electrical data  
Electrical control Garaventa 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 400 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Garaventa
Cab model ??
Bubble colour
Seating leather
Seat heater no
Persons per cab
Number of cabs 95 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction ??
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime ??
Situation of entrance parallel
Situation of exit parallel
Loading carpet ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 26/02/21 17:34:56
PHOTOS: 29/01/12 19:15:00

Lift-Statistics
8759 visit(s) since 19/04/03
Last visit 16/10/21

LIFT-WORLD IDs
Lift-ID: 1305
Place-ID: 1724

https://www.seilbahntechnik.net/en/lifts/1305/datas.htm