Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  161-FUC Hartkaiserbahn

Valley station
Valley station

Line
Line




General information  
Place Ellmau 
resort ?? 
Region Tyrol 
Country   
Name of lift Hartkaiserbahn 
Type 161-FUC 
Lift manufacturer Vöest-Alpine 
Year of construction 1972 
Commissioning date 1972 
Date of closing down 06/04/15 
Date of pull down 07/04/15 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 822 m
Height of mountain station 1528 m
Vertical rise 706 m
Route distance 2317 m
Horizontal length ?? m
Average incline 32,00 %
Largest incline 46,00 %
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2070 Pers/h
Travel time 4,3 min
Driving speed line 12,0 m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 840 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Gangloff 
Cab model ?? 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 161 
Number of cabs 2 Stk
Carriage Operator yes 


rope data  
Rope manufacturer St. Egydyer 
Length of haul rope ?? m
Length of counter-rope ?? m
Total weight of haul rope ?? t
Total weight of counter-rope ?? t
Haul rope diameter 36 mm
Counter-rope diameter 22 mm
Nominal strength of haul rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Type of turnout ?? 
Integrated rescue system ?? 
Asset number (Trail map) 80 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/12/23
PHOTOS: ??

Lift-Statistics
33736 visit(s) since 11/08/03
Last visit 06/10/24

LIFT-WORLD IDs
Lift-ID: 1223
Place-ID: 74

https://www.seilbahntechnik.net/en/lifts/1223/datas.htm