Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Häsing

Valley station
Valley station

Line
Line

Pillars
Pillars

General information  
Place Gostling an der Ybbs 
resort Sunny Card 
Region Lower Austria 
Country   
Name of lift Häsing 
Type 2-CLF 
Lift manufacturer Girak 
Year of construction 1974 
Commissioning date 1974 
Date of closing down 2004 
Date of pull down 2004 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1440 m
Height of middle station(s) ?? m
Height of mountain station 1691 m
Vertical rise 251 m
Route distance 927 m
Horizontal length ?? m
Average incline 28,40 %
Largest incline 62,90 %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1400 Pers/h
Travel time 6,5 min
Driving speed line 2,4 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Girak 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 23/11/23
PHOTOS: ??

Lift-Statistics
6441 visit(s) since 30/08/03
Last visit 13/05/24

LIFT-WORLD IDs
Lift-ID: 2540
Place-ID: 414

https://www.seilbahntechnik.net/en/lifts/2540/datas.htm