Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

 Cerreto Laghi


Height of valley station: 1320 m
Travel time: 7 min
Height of mountain station: 1650 m
Driving speed line: 2,4 m/s
Route distance: 1045 m
Maximum capacity: 2400 Pers/h
Year of construction: 2001 
Lift manufacturer: Poma 
Seasontime: ??
 

Height of valley station: 1640 m
Travel time: 5 min
Height of mountain station: 1820 m
Driving speed line: 2,4 m/s
Route distance: 608 m
Maximum capacity: 1796 Pers/h
Year of construction: 2006 
Lift manufacturer: Agudio 
Seasontime: ??
 



3-CLF  Vallefonda
Height of valley station: ?? m
Travel time: ?? min
Height of mountain station: ?? m
Driving speed line: ?? m/s
Route distance: ?? m
Maximum capacity: ?? Pers/h
Year of construction: 2024 
Lift manufacturer: Leitner 
Seasontime: ??
 



Support
Wrong data or something is missing?
Support us!
LIFT-WORLD IDs
Place-ID: 1355