Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Schaufeljochbahn

Line
Line

Line
Line

Line
Line

General information  
Place Neustift im Stubaital 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Schaufeljochbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2003 
Commissioning date 2003 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 2883 m
Height of mountain station 3166 m
Vertical rise 283 m
Route distance 1177 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 3,82 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer CWA 
Cab model OMEGA III-8 LWI 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 60 Stk
Cab distance 60 m
Cab interval 12 s
Garage type ground floor 
Garage place valley and mountain 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way 5,2 m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 4 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 15/02/24
PHOTOS: ??

Lift-Statistics
26589 visit(s) since 21/11/02
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 847
Place-ID: 87

https://www.seilbahntechnik.net/en/lifts/847/datas.htm