Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Hornlift 2000

Valley station
Valley station

Mountain station
Mountain station

Line
Line

General information  
Place Alpbach 
resort ?? 
Region Tyrol 
Country   
Name of lift Hornlift 2000 
Type 4-CLF 
Lift manufacturer Doppelmayr 
Year of construction 1999 
Commissioning date ?? 
Date of closing down 2022 
Date of pull down 2022 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1665 m
Height of mountain station 2036 m
Vertical rise 371 m
Route distance 1081 m
Horizontal length ?? m
Average incline 37,00 %
Largest incline 55,00 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1600 Pers/h
Travel time 8,0 min
Driving speed line 2,4 m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type 4FG 
Cab manufacturer Doppelmayr 
Cab model 4E98/A Fix 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 101 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 14/02/24
PHOTOS: ??

Lift-Statistics
18771 visit(s) since 21/06/03
Last visit 27/03/24

LIFT-WORLD IDs
Lift-ID: 765
Place-ID: 48

https://www.seilbahntechnik.net/en/lifts/765/datas.htm