Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Rio Gere - Son Forca

Valley station
Valley station

Valley station
Valley station




General information  
Place Cortina d'Ampezzo 
resort ?? 
Region Veneto 
Country   
Name of lift Rio Gere - Son Forca 
Type 4-CLD/B 
Lift manufacturer Agamatic 
Year of construction 1996 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1688 m
Height of mountain station 2220 m
Vertical rise 532 m
Route distance 1879 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1398 Pers/h
Travel time ?? min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control BMB 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type A104 
Cab manufacturer Doppelmayr 
Cab model Sky Dancer 
Bubble colour neutral 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 85 Stk
Cab distance 45 m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Redaelli 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? ITL
Currency (Construction costs) Italian lira 
Construction period 5 months
Seasontime ❄ ☀ all-season 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 08/05/23
PHOTOS: ??

Lift-Statistics
24731 visit(s) since 30/01/05
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 5378
Place-ID: 1382

https://www.seilbahntechnik.net/en/lifts/5378/datas.htm