Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Alpsteig, Elfenberg










General information  
Place Mautern in Steiermark 
resort ?? 
Region Styria 
Country   
Name of lift Alpsteig, Elfenberg 
Type 2-CLF 
Lift manufacturer Doppelmayr 
Year of construction 2002 
Commissioning date ?? 
Second-hand lift. Formerly lift no. 19475 


Infos for handicapped persons
Sorry, no information available.

Characteristics
second-Hand Lift
middlestation

geometric data  
Height of valley station 716 m
Height of middle station(s) 947 m
Height of mountain station 1099 m
Vertical rise 383 m
Route distance 1491 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1207 Pers/h
Travel time ?? min
Driving speed line 2,4 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type 2FG 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 207 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime summer 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 23/04/23
PHOTOS: ??

Lift-Statistics
8075 visit(s) since 15/05/03
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 433
Place-ID: 492

https://www.seilbahntechnik.net/en/lifts/433/datas.htm