Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-MGD Olang II




Line
Line




General information  
Place Olang / Valdaora 
resort Dolomiti Superski 
Region Trentino-South Tyrol 
Country   
Name of lift Olang II 
Type 6-MGD 
Lift manufacturer Agamatic 
Year of construction 1989 
Commissioning date 1990 
Date of closing down 08/03/20 
Date of pull down 09/03/20 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 2077,5 m
Height of mountain station 2278,5 m
Vertical rise 201 m
Route distance 1064,25 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2160 Pers/h
Travel time ?? min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model OMEGA 6s 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 58 Stk
Cab distance 48 m
Cab interval 9,5 s
Garage type ground floor 
Garage place valley and mountain 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Austria Draht 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? ITL
Currency (Construction costs) Italian lira 
Construction period ?? months
Seasontime ??  
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 29/04/23
PHOTOS: ??

Lift-Statistics
15555 visit(s) since 13/12/03
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 3688
Place-ID: 1496

https://www.seilbahntechnik.net/en/lifts/3688/datas.htm