Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD/B Ochsenalmbahn 2


Mountain station
Mountain station

Line
Line

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Feichten
resort Kaunertaler Gletscher
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Ochsenalmbahn 2 
Type 4-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 1991 
Commissioning date ??

geometric data  
Height of valley station 2400 m
Height of mountain station 2750 m
Vertical rise 350 m
Route distance 1400 m
Horizontal length ?? m
Average incline 27,00 %
Largest incline 58,60 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2500 Pers/h
Travel time 4,5 min
Driving speed line 4,8 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Middle station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Doppelmayr
Cab model 4E95/B
Bubble colour
Seating Icolan
Seat heater no
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 11/12/12 19:27:00
PHOTOS: 05/01/07 22:23:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
11669 visit(s) since 26/09/03
Last visit 09/12/19

LIFT-WORLD IDs
Lift-ID: 3057
Place-ID: 222

https://www.seilbahntechnik.net/en/lifts/3057/datas.htm