Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  12-MGD Schönleitenbahn I







Line
Line

General information  
Place Saalbach 
resort Ski Alpin Card 
Region Salzburg 
Country   
Name of lift Schönleitenbahn I 
Type 12-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1987 
Commissioning date ?? 
Date of closing down 03/04/16 
Date of pull down 2016 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 942,5 m
Height of mountain station 1492,5 m
Vertical rise 550 m
Route distance 1581,89 m
Horizontal length 1483,20 m
Average incline 28,00 %
Largest incline 37,00 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2048 Pers/h
Travel time 5,42 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model OMEGA 12 
Seating none 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab 12 
Number of cabs 36 Stk
Cab distance 105,46 m
Cab interval 21,09 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Austria Draht 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 47 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 17/02/22
PHOTOS: ??

Lift-Statistics
25963 visit(s) since 20/04/03
Last visit 27/03/24

LIFT-WORLD IDs
Lift-ID: 2339
Place-ID: 295

https://www.seilbahntechnik.net/en/lifts/2339/datas.htm